Pouring a concrete slab is an important process that requires careful planning, proper tools, and some physical labor. With the right preparation, you can have a level, durable concrete pad for garages, sheds, patios, walkways, and more. We’ll walk through the complete process step-by-step so you can take on this satisfying DIY project.

Choose the Slab Location

The first step is deciding where to place the concrete slab. Consider the following:

  • What purpose will the slab serve? If building a shed or garage, ensure the location follows local codes and allows enough clearance.
  • Drainage is crucial; avoid low spots where water can pool on the slab surface. Choose a flat or gently sloping site.
  • Allow adequate space around the slab for construction and future use. Adding a few extra feet on each side is better than having a cramped workspace.
  • Minimize work by situating the slab near driveway access for concrete delivery.
  • Check whether underground utilities run through the area to avoid a hazardous and costly encounter later.

Once you’ve selected an optimal spot, mark the slab perimeter with stakes and layout paint.

Choose the Right Concrete Mix

Concrete comes pre-mixed or as separate dry ingredients to mix onsite. Premixed concrete is the easiest choice for small DIY slabs:

  • Premixed concrete – Buy at a home improvement store. It comes ready to pour and hardens in a few hours without extra work. Just have a truck deliver it to your driveway.
  • Onsite concrete – For larger slabs, consider mixing concrete onsite from sand, gravel, cement, and water. This requires a big mixer but lets you make as much concrete as needed.

The concrete mix you choose depends on the project. Common options include:

  • Standard mix – An all-purpose mix for simple slabs like patios and shed floors. Offers a good balance of strength and workability.
  • High-strength mix – Contains more cement for added durability. Ideal for garage slabs, walkways, and driveways that need to withstand heavy use.
  • Fast-setting mix – Sets very quickly, usually within a few hours. Useful when you need a slab completed rapidly.
  • Cold weather mix – Specially formulated to cure even in low temperatures below 40°F. Needed if pouring concrete in winter or early spring.

Talk to staff at a concrete supply store to find the right concrete type for your specific project. Buy at least 10% more concrete than your calculations show to allow for spills and overruns.

Prepare the Base

A proper base is key to preventing the slab from cracking or sinking over time. Here’s how to create a stable, long-lasting base:

Excavate and Compact Soil

  • Remove all topsoil and vegetation from the slab site. Dig down at least 6 inches.
  • Compact the exposed subgrade thoroughly with a plate compactor or hand tamper. This firms up the soil to prevent settling.
  • Check that the area drains well by spraying water and ensuring no puddles form. Fill any low spots with compacted fill dirt.

Add Gravel Base Layer

  • Dump, spread, and compact a 4 inch layer of compactable gravel base (road base). Compact to around 95% density.
  • Make this base layer slightly wider than the slab perimeter to provide extra support.
  • Level and crown the gravel base so it slopes about 1/4 inch per foot away from the center to facilitate drainage.

Set Form Boards

  • Mark the exact slab perimeter with stakes. Run string lines between the stakes to guide form board placement.
  • Cut wood boards (at least 2x4s) to create a form around the slab. Fasten boards together at corners.
  • Fix boards to ground with spikes, fully enclosing the slab area. Check corners for 90 degree angles.
  • Brace form boards so they don’t bulge when filled with heavy, wet concrete.

The gravel base provides a flat, stable layer for the slab foundation. Form boards contain the liquid concrete while it cures.

Add Underground Materials

If you need any infrastructure below the slab, install it now before pouring concrete:

  • Rebar grid – A lattice of steel rebar adds strength to prevent cracking. Get 6×6 steel wire mesh and cut panels to lay over the gravel base. Overlap panels 6 inches.
  • Piping – For in-floor heating, electrical, or plumbing, lay PVC conduits in the gravel and tie together with zip ties. Leave outlet boxes exposed.
  • Vapor barrier – A plastic moisture barrier prevents groundwater entering the slab. Overlap sheets 6-12 inches and seal seams with tape.

Prepare for Pouring

With your formwork complete, final preparations will ensure the pour goes smoothly:

  • Make relief cuts – Use a saw to cut relief joints into the form boards where slab sections meet. This enables the concrete to expand naturally as it cures.
  • Set anchor bolts – If attaching a permanent structure to the slab, drill and epoxy anchor bolts into the compacted subgrade according to the structure instructions.
  • Wet base – Spray a light mist of water over the gravel base immediately before pouring. This prevents the dry gravel from absorbing moisture from fresh concrete.
  • Stage tools – Have shovels, trowels, floats, and edging tools nearby to work and finish the concrete immediately after pouring.
  • Keep forms damp – Mist the form boards with water right before concrete delivery to prevent them from absorbing moisture.

Order and Pour Concrete

With everything prepped, it’s time to order concrete and get pouring! Here are some tips:

  • Delivery – Order concrete 2-3 days ahead from a local supplier. Schedule trucks for consistent 30 minute intervals to ensure you pour concrete as it arrives.
  • Pour depth – Slabs 4-6 inches thick are typical for sheds, while garage and workshop slabs often require a thickness of 6 inches or more. Order concrete accordingly.
  • Deposit concrete quickly – As the truck empties into the forms, rapidly spread concrete in the slab area before it starts setting up. Use shovels and come-alongs to distribute.
  • Compact evenly – Tamp concrete with a come-along tool to pack it down and remove hidden air pockets. Don’t overwork it though.
  • Screed top – Drag a 2×4 screed board back and forth atop the forms to flatten and smooth the concrete until it’s level with the top of forms.
  • Don’t rush troweling – Let poured concrete fully firm up before starting to trowel. Impatient troweling causes surface imperfections.

Finish the Slab Surface

Finishing the still-soft concrete slab gives it a smooth appearance and durable surface:

Basic Slab Finish

  • Bullfloat – Once bleed water evaporates, use a large bullfloat tool to flatten and smooth the surface.
  • Edge – Run an edging tool around the slab perimeter to create rounded edges.
  • Broom – For a slip-resistant profile, lightly drag a broom across the surface.

Advanced Decorative Finishes

  • Stamped patterns – Press rubber mats or stamps into concrete to create brick, stone, or geometric imprints.
  • Exposed aggregate – Seed the wet concrete with rocks then wash the surface to reveal decorative aggregates.
  • Stained concrete – Apply special reactive stains for rich marbled coloring effects.
  • Sawed cuts – Use a concrete saw to cut decorative control joints into the curing slab.

Let concrete fully cure for several days before excessive use. Remove form boards after one day. Backfill and landscape around the slab perimeter. Your new concrete pad is complete!

FAQs

Below are some common questions about pouring a concrete slab:

What kind of gravel is best for a concrete slab base?

Compactable gravel made up of a mix of granite dust, sand, and 3/4 inch or smaller crushed gravel is ideal. Road base gravel works very well. Avoid rounded river gravel.

How much gravel is needed under a concrete slab?

Plan on needing 6-8 inches of compacted gravel base material for a typical residential slab.

How thick should a concrete slab be for a shed?

A 4-6 inch slab thickness is sufficient for a standard utility shed. Use a thicker 6+ inch pour for larger sheds or workshops.

How much concrete do I need for a 10×10 slab that’s 4 inches thick?

A 10×10 slab with a thickness of 4 inches requires about 3.7 cubic yards of concrete. Remember to order at least 10% extra.

Can it rain on fresh concrete?

It’s best to avoid rain on newly poured concrete for 24 hours or more. If light rain falls, cover the slab with plastic sheeting to allow proper curing.

How long does it take for concrete to fully cure?

Curing time depends on concrete type, temperature, and humidity. On average, allow 7-10 days before heavy use, 10-14 days for vehicle use, and 28+ days to fully cure.

What causes cracks in concrete slabs?

Common reasons are inadequate preparation, freeze/thaw cycles, overworking the concrete, improper joints, unstable soil, insufficient curing, and heavy loads.

How can I get old oil stains out of my concrete slab?

Scrubbing the stains with an industrial degreaser or alkaline cleaning solution can help remove oil and grease that has soaked into concrete. Harsher methods like grinding may be required for stubborn stains.

Conclusion

Creating a durable, long-lasting concrete slab requires careful planning and hard work, but yields an extremely useful feature in your yard. By excavating and compacting the soil, installing a gravel base, building secure form boards, pouring high quality concrete, and applying the right finishes, you can obtain professional-looking results. Focus on each step and don’t rush the process. Before you know it, you’ll have the perfect concrete pad for expanding your living space, parking vehicles, or pursuing hobbies and projects.